Plattsburgh Water Filtration Plant Clear Well Tank

Owner: City of Plattsburgh

Engineer: CDM Smith

General Contractor: Branon Construction Co. Inc.

Project Dates: March 2009 - September 2010

 

Branon Construction performed all site work, underground utilities and concrete flatwork associated with the clearwell structure. The job started with the clearing of the site and the excavation of 30,000 cubic yards of soil. Once the cut was finished we placed stone sub-base for the concrete to be placed on. All rebar was tied and the tank floor was poured. The water lines associated with the storage tanks ranged from 12" to 36" ductile iron pipe. A stand-alone valve pit was also placed next tot he clear well.