Four Seasons Subdivision Water Line

Owner: Four Seasons Subdivision

Engineer: Laberge Group

General Contractor: Branon Construction Co. Inc.

Direction Boring Subcontractor: Ed Garrow and Sons

Project Dates: December 2012 - February 2013

 

This project started out with a 30 degree uphill grade. The 8" waterline was tapped off of the existing 12" water main and ran up the incline. Once at the pinnacle of the hill the waterline was run 400' towards route 374. Ed Garrow and Sons then bored under 374 and pulled an HDPE water main into the bore. The HDPE was then connected at each end and the waterline continued another 300' on the north side of the road. All testing and chlorination was also performed by Branon Construction.